AC · Plumbing · Electricalby Service ProCallFree trial

Industry stats

Benchmarks for the trades

Sourced figures for owners who would rather check than guess. Every number names where it came from.

What a paid lead costs

Google Ads cost per lead. Branded and non-branded search behave like two different businesses.

SearchLight Digital benchmarks. HVAC: January 2026, 816 contractors. Plumbing: Q1 2026, 524 contractors; Local Services Ads: February 2026.
Campaign typeHVACPlumbing
Branded search$34Not reported
Local Services Ads$51$57
Performance Max$72$82
All campaigns, blended$104Not reported
Non-branded search$149$183

Speed and the phone

66%

of calls were actually answered by home service businesses in one analysis. Owners estimated 97%.

Service Direct, Home Service Call Performance Report (2019), as reported by Abby Connect
80%

of callers who reach voicemail do not leave a message.

Forbes survey, as reported by DestinationCRM
85%

of people whose call goes unanswered never call back.

Message Direct research, as reported by Windsor Telecom
100×

higher odds of reaching a web lead called at 5 minutes instead of 30.

Oldroyd and Elkington, Lead Response Management Study (2007)
21×

higher odds of qualifying that lead across the same gap.

Oldroyd and Elkington, Lead Response Management Study (2007)
42 hrs

average first response to a web lead across 2,241 U.S. companies.

Oldroyd, McElheran and Elkington, Harvard Business Review (2011)

Your existing customers

5-25×

what it can cost to win a new customer compared with keeping one.

Gallo, Harvard Business Review (2014)
25-95%

potential profit gain from a five-point improvement in retention.

Reichheld, Bain & Company
79%

of consumers would switch to a competitor after one terrible experience.

Verint, The State of Customer Experience 2026

AI on the phone

55%

trust AI to resolve an issue when there is a clear path to a human.

Five9, 2026 Business Leaders CX Report
26%

trust AI to resolve it when there is no path to a human.

Five9, 2026 Business Leaders CX Report
30-45%

average yearly turnover in contact-center jobs.

Nextiva, Key Causes of Call Center Turnover (2026)

The workforce

All three trades are projected to grow much faster than average.

U.S. Bureau of Labor Statistics, Occupational Outlook Handbook. Pay and jobs: 2025. Outlook: 2025-35.
OccupationJobsMedian pay10-yr growthOpenings a year
HVAC mechanics and installers440,900$61,01011%40,600
Plumbers, pipefitters and steamfitters510,600$63,8007%42,000
Electricians821,000$63,1909%72,700

Your people: pay, turnover, hiring and shortages

What a typical trade business pays, how often people leave, what it costs to replace them, and how tight the market is.

Typical annual pay by role

U.S. Bureau of Labor Statistics, May 2025, all industries and national. Overtime pay is not included. Your market may differ a lot, so use state and metro data at bls.gov/oes.
RoleMedianLowest 10%Highest 10%Source
HVAC technician$61,010$40,050$95,210BLS
Plumber$63,800$44,150$108,420BLS
Electrician$63,190$42,640$108,510BLS
Field supervisor (mechanics and installers)$79,860--BLS
Sales representative, services$69,990--BLS
Dispatcher (non-emergency)$50,340--BLS
Bookkeeper$50,670--BLS
Customer service representative$44,770--BLS
Plumbing helper (mean, not median)$43,730--BLS

What an employee really costs

In construction-related occupations, employers spent $47.46 an hour in total compensation in June 2026: $32.25 in wages and $15.21 in benefits. That is about 47 cents of benefits for each wage dollar. At that national average, a tech earning the $61,010 median would cost about $89,800 a year, before the truck, tools, training and overhead. Small shops often offer fewer benefits, so use your own numbers.

Technician turnover

Customer data published by a field service software provider, trailing 12 months through January 2026, participating customers only. Customers of one software company may not represent every shop.
TradeTurnoverAverage tenureMedian tenure
Electrical21%3.44 years2.9 years
Plumbing18%3.96 years3.47 years
HVAC16%3.54 years3.06 years

Other published figures run higher or lower depending on who is counted. Across all of construction, about 4.3% of jobs turned over in September 2026 (BLS JOLTS, preliminary), a figure that includes project work ending. Measure your own: technicians who left in 12 months ÷ your average number of technicians.

Hiring and replacement costs

MeasureFigureSource and quality
Average cost per hire, non-executive$5,475SHRM 2025 benchmarking, all industries
Full cost to replace one HVAC tech, including lost production$15,000 to $25,000Vendor and industry estimates. Not audited, so treat as a starting point.
Time for a new hire to reach baseline productivity6 to 12 monthsField service software provider, customer data
Plumber or electrician apprenticeship4 to 5 years, about 2,000 paid hours a yearBLS

Example: 10 techs × 18% turnover × $20,000 per departure = $36,000 a year. Swap in your own numbers.

The shortage

  • Construction needs an estimated 349,000 net new workers in 2026 and about 456,000 in 2027, according to Associated Builders and Contractors. More than half of the 2026 need is to replace retirees, and about 20% of the workforce is over 55.
  • 92% of construction firms had trouble filling positions in the AGC and NCCER 2025 survey. 77% of firms that employ electricians said they are hard to find.
  • The top reasons: candidates lack skills or qualifications (57%), new hires fail to show up or quit soon after starting (48%), and they lack credentials such as a license or clean background check (41%).

These surveys cover construction broadly, not only home service companies.

How to measure your own

Use the same definitions month to month, or the trend means nothing.

KPIFormulaWhy it matters
Answer rateAnswered calls ÷ total inbound callsShows how much demand reaches a person
Average speed to answerTotal wait time ÷ answered callsLong waits become hang-ups
Abandonment rateCalls hung up in queue ÷ calls offeredEach one may be a lost job
Speed to leadTime from lead received to first call attemptInterest fades quickly
Connect rateLive conversations ÷ dialsShows list quality and calling times
Booking rateBooked appointments ÷ live conversationsMeasures the call itself
Show rateShown visits ÷ booked visitsMeasures booking quality
Close rateSold jobs ÷ shown visitsMeasures the in-home visit
Average ticketSold revenue ÷ sold jobsSet separately for service and replacement
Cost per leadMarketing spend ÷ leadsReport branded and non-branded separately
Cost per shown appointmentProgram spend ÷ shown visitsCloser to what you actually buy
Board fillBooked slots ÷ available slotsUse techs actually on the schedule
Plan renewal ratePlans renewed ÷ plans expiringShows customer loyalty

Third-party figures come from the named sources and may change. Lead-cost benchmarks: SearchLight Digital, plumbing and Local Services Ads; HVAC figures as summarized by WebTonic.

Best practices

Best practices for what these numbers mean

Missed calls

Calls ring out at lunch, after 5 and on the first hot or cold day, and most of those callers don't call back.

  1. Measure your true answer rate by hour of day, not your gut feel. Most owners guess high.
  2. Cover the gaps on purpose: lunch, the first and last hour of the day, Saturdays and the first big weather day.
  3. Set an overflow rule: after a set number of rings or calls waiting, calls roll to a second person or an outside team.
All 6 practices, and when to get help

Slow response to new leads

Web forms, ad leads and quote requests wait hours for a call back, and by then the homeowner has booked someone else.

  1. Send every lead source to one place, so nothing sits in an inbox.
  2. Call first, then text if there is no answer. Leave a short voicemail with a call-back number.
  3. Make three attempts in the first 48 hours, at different times of day.
All 6 practices, and when to get help

Hiring and keeping good techs

Good techs are hard to find and easy to lose, and every departure costs months of production.

  1. Hire for attitude and teach the trade, with a clear path from helper to lead.
  2. Plan the first 90 days: ride-alongs, checklists and weekly check-ins.
  3. Hold stay interviews with your best people before they think about leaving.
All 6 practices, and when to get help